thumbnail

Trắc nghiệm Tiếng Anh chuyên ngành - Công nghệ phần mềm (CNPM) - Buổi 8 - Đại học Điện lực

EDQ #95470

Đề thi nằm trong bộ sưu tập: Tuyển Tập Bộ Đề Thi Trắc Nghiệm Môn Tiếng Anh Trường Đại Học Điện Lực (EPU) - Có Đáp Án

Số câu hỏi: 30 câuSố mã đề: 1 đềThời gian: 1 giờ

33,198 lượt xem 2,547 lượt làm bài


Bạn chưa làm đề thi này!!!

 

Xem trước nội dung:

Câu 1: 1 điểm

How can we meaningfully assess the value of a system that allows a patient to book a medical appointment, or a system that provides information ______ at bus stops

A.  

on bus arrive time

B.  

in bus arrival time

C.  

on bus arrive times

D.  

on bus arrival times

Câu 2: 1 điểm
Instead people talk about a business case for the system, _____ emphasize the positive aspects while minimizing the negative.
A.  
which tends be
B.  
what tend to
C.  
which tend to
D.  
which tends to
Câu 3: 1 điểm
This would probably ______ temporary advantage, until other banks caught up.
A.  
be one a
B.  
be on a
C.  
be off a
D.  
be only a
Câu 4: 1 điểm

A feasibility study is an investigation ______ a development is worthwhile.

A.  

to check than

B.  

to checking that

C.  

to check that

D.  

to check those

Câu 5: 1 điểm
This is typical of software costs in embedded systems, ______ is simply one component among many others.
A.  
what the software
B.  
who the software
C.  
why the software
D.  
where the software
Câu 6: 1 điểm
An ATM is part hardware, part software, ______ carry out a feasibility study for the complete system or limit ourselves to the software component.
A.  
so we could other
B.  
so he could either
C.  
so we could either
D.  
so we coulds either
Câu 7: 1 điểm
The hardware cost includes ______
A.  
the card reader
B.  
all of the given answers are correct
C.  
the display
D.  
the processor
Câu 8: 1 điểm
The upgrade cost is part of the cost of some future system and not strictly part of the current costing, ______ in mind at the evaluation stage.
A.  
but is worth bearing
B.  
but is worth bear
C.  
but are worth bearing
D.  
but is worthy bearing
Câu 9: 1 điểm
_____ users are concerned, they are sometimes known as clients or customers.
A.  
As the
B.  
As far as the
C.  
As low as the
D.  
As far the
Câu 10: 1 điểm
However, ______ the viability on the basis of cost, we must look at the complete system.
A.  
we are assessing
B.  
if he are assessing
C.  
if we are assess
D.  
if we are assessing
Câu 11: 1 điểm
It is easy to be drawn into judging ______ basis of costs, but there are other approaches.
A.  
everything are the
B.  
everything on the
C.  
everything the
D.  
everything is the
Câu 12: 1 điểm
Thus motor cars, buildings and televisions need to be
A.  
robust
B.  
reliable
C.  
all of the given answers are correct
D.  
easy to maintain
Câu 13: 1 điểm
However, most banks in the industrialized world ______ computerization and this is probably the significant cost benefit.
A.  
have reduced jobs but
B.  
have reduce jobs by
C.  
has reduced jobs by
D.  
have reducing jobs by
Câu 14: 1 điểm
While all of these costs should be estimated in advance of developing a system, ______ very difficult to estimate the cost of construction and of maintenance.
A.  
it be in practice
B.  
it is in practice
C.  
it is practice
D.  
it is in practical
Câu 15: 1 điểm
Many people develop software purely for fun. Open source programmers are a prime example. Their motivations include providing ______
A.  
useful tools
B.  
collaborating with others
C.  
enjoying the act of programming
D.  
all of the given answers are correct
Câu 16: 1 điểm
If we cannot accurately specify ______, it is futile to implement it.
A.  
what is need on
B.  
what is needed
C.  
what were needed
D.  
what is need
Câu 17: 1 điểm
He or she summons the analyst and thereafter they collaborate ______ requirements specification.
A.  
on drawing the
B.  
drawing up the
C.  
on drawing up the
D.  
on drawing up than
Câu 18: 1 điểm
Arguably, establishing the requirements _____ important activity in software development.
A.  
is then single most
B.  
is the singles most
C.  
are the single most
D.  
is the single most
Câu 19: 1 điểm
Large military projects are sometimes funded because they are considered necessary (militarily or politically), ______.
A.  
what are the cost
B.  
whatever the cost
C.  
what is cost
D.  
what is the cost
Câu 20: 1 điểm
When the engineers are dealing with requirements, they _____ as systems analysts or, simply, “analysts”.
A.  
are normally referred to
B.  
are normally referred in
C.  
is normally referred to
D.  
are normally referring to
Câu 21: 1 điểm
The provision of ATMs ______ customers to the bank and this benefit could be costed.
A.  
might attracting
B.  
might attract
C.  
might be attract
D.  
might been attract
Câu 22: 1 điểm
Some systems are, arguably, socially useful and, perhaps, ______ a costingbased approach.
A.  
outside scope of
B.  
outside the scope
C.  
outside then scope of
D.  
outside the scope of
Câu 23: 1 điểm
The dominant part of this stage is communication ______ users and the software developer or engineer.
A.  
between then
B.  
between than
C.  
between them
D.  
between the
Câu 24: 1 điểm
Bear in mind that sometimes the feasibility study _____ deciding that the project should be abandoned
A.  
plays large part in
B.  
plays a large part in
C.  
play a large part in
D.  
plays a large in
Câu 25: 1 điểm
Some people, perhaps seduced by technology, take the view that a computer system _____ a manual system.
A.  
is obviously better then
B.  
are obviously better than
C.  
re obviously better then
D.  
is obviously better than
Câu 26: 1 điểm
There will probably be ______ extra server capacity at the bank in order to handle the requests from ATMs.
A.  
a need for
B.  
a need from
C.  
need for
D.  
an need for
Câu 27: 1 điểm
Cost-benefit analysis ______ developing the system with the money saved by using it.
A.  
compares a cost of
B.  
compare the cost of
C.  
compares the cost of
D.  
compares the costs off
Câu 28: 1 điểm
There is, however, another common reason ______ feasibility study: once an idea for a system has been suggested, the project generates its own momentum, people become committed to it and it cannot be stopped.
A.  
for avoidings a
B.  
for avoid a
C.  
for avoiding a
D.  
for avoiding
Câu 29: 1 điểm
Logically the first stage of software development _____ the users of the system want.
A.  
is to establishing precisely what
B.  
are to establish precisely what
C.  
is to establish precisely what
D.  
is to establish precisely whatever
Câu 30: 1 điểm

Now, all these figures are indicative, ______ to see how to go about costbenefit analysis.

A.  

but the point is

B.  

but one point is

C.  

be the point is

D.  

but the point are

Đề thi tương tự

Trắc nghiệm Tiếng Anh chuyên ngành Công nghệ phần mềmĐại học - Cao đẳngTiếng Anh

1 mã đề 30 câu hỏi 1 giờ

91,1337,004

Trắc Nghiệm Tiếng Anh Chuyên Ngành Công Nghệ Phần Mềm EPUTiếng Anh

8 mã đề 392 câu hỏi 1 giờ

89,0346,853

Câu Hỏi Trắc Nghiệm Tiếng Anh Chuyên Ngành Công Nghệ Phần Mềm - Buổi 4 | Đại Học Điện Lực (EPU)Đại học - Cao đẳngTiếng AnhCông nghệ thông tin

1 mã đề 30 câu hỏi 1 giờ

71,7225,508